Trusted final: infrastructure valid; geometry checks executed; gates passed. Official J 0.6575; reporting S 0.6513.
Verified full run archiveMZI-v1
Broadband 4x4 Rectangular MZI Mesh
Design a broadband 4×4 rectangular MZI mesh with independently controlled interferometers and trusted optical, electrical, and thermal verification.
J_acc = 0.3175 · calibration design-jacc-2026-09-05-v2. S ≥ 1 meets the aggregate reporting reference, not every optical or resource specification.
Saved-run scores and gate outcomes are unchanged; this reporting update is not a new evaluation against current task code.
J_acc = 0.3175 · calibration design-jacc-2026-09-05-v2. S ≥ 1 meets the aggregate reporting reference, not every optical or resource specification.
Saved-run scores and gate outcomes are unchanged; this reporting update is not a new evaluation against current task code.
2 published runs are compared on one elapsed-time chart. Their final layouts and score evidence remain separate.
Why these results are reported this way
Trusted final: infrastructure valid; geometry checks executed; gates passed. Official J 0.1555; reporting S 1.3426.
Verified full run archiveHow to interpret this result
A valid outcome means the submitted artifact cleared the evaluator gates recorded for this archived run. It does not imply that every possible physical specification, fabrication condition, or later task revision has been independently re-tested.
Reporting score S vs. time
Each run starts at its own elapsed time zero. Hollow markers are gate-ineligible probes, not measured S = 0.
Codex · GPT-5.6-sol
Valid · 10 probes · reporting score S 0.6513
Codex · GPT-5.6-sol GDS layout
The exact submission the evaluator scored, rendered from its GDS
Claude Code · Claude Opus 5.5
Valid · 6 probes · reporting score S 1.3426
Claude Code · Claude Opus 5.5 GDS layout
The exact submission the evaluator scored, rendered from its GDS